
Add to Cart
Sound Absorbing Material Sliding Movable Partitions Walls For Banquet Room And Office Room
Series | BG 65 | BG 85 | BG100 |
Panel supension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65 mm | 85 mm | 100 mm |
Max height | 400 mm | 600 mm | 800 mm |
Panel width | 600-1230 mm | 600-1230 mm | 600-1230 mm |
Face material | 9 mm | 9 mm | 9 mm |
Pass doors | Single Door or Double Door | ||
Sound insulation | 20 – 32 db | 28 – 36 db | 32 – 50 db |
Finish Material | Plywood / MDF /Laminate / Melamine / Gypsum | ||
Board / Fabric / Insulation / Fireproof /Wall Paper /Vinyl /Painting /etc,(Customized) |
Partition details
1: no floor track ,hanging
There is no track on the floor, just install the track on the ceiling
2: sound insulation and environmental protection
Sound insulation effect is good, the maximum sound insulation coefficient can reach 60DB
3: heat insulation and energy saving
Excellent heat insulation performance, according to the different seating rate, the large space into a small space, in order to reduce the power consumption of air conditioning
4: efficient fire prevention
Adopt efficient fireproof material, good fireproof performance
5: beautiful and elegant
The surface is decorated at will, can be unified with indoor adornment effect
6: flexible
Partition walls freely, promote flexible, a person can complete the whole process of partition
7: convenient collection
Board, partition board can be hidden in the special storage cabinet, does not affect the overall beauty
8: widely used
It can be used in conference hall, exhibition hall, restaurant, hotel, banquet hall, balcony, factory and office etc
9: rugged and durable
The top of the steel structure reinforcement, door aluminum alloy frame, built-in steel structure telescopic mechanism, durable
FAQ
1:What you should you do on site?
A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time ?
The lead time is 7 days to 10days.
4:How to transport?
Sea transport is a common mode of transportation.In an emergency,can be air freight .
5:How do the goods packing?
Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure?
Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation.
Thirdly, we quote the movable wall in acordance with confirmed drawings.