
Add to Cart
Soundproof Operable Wall Movable Partition Walls For Restaurant Hospital Gym Partition wall description Activity partition calls (activity partition, movable partition, mobile partition, orbit partition, mobile partition).Activity partition product 65 series, 85 series, 100 series, ultra high series activity partition calls again (activity partition, movable partition, movable partition, track partition, movable partition). Production: has advanced mechanical equipment, high - precision aluminum alloy partition and accessories. Factory management, production, cutting, site assembly, no paint, no odor, no pollution of green environmental protection products. Practical aspects: its products environmental protection, sound insulation (50db), stability, fire prevention (B level detection), beautiful. Assembly structure, the use of Angle column to turn at will, reset the utilization rate of up to 90%, the real realization of "can take away the decoration". Service: we have experienced designers, senior engineers, skilled construction team; Provide comprehensive pre-sale, sale, after-sale and a series of quality services. Applicable places: hotel multi-functional hall, conference room, banquet hall, restaurant private room, training room, office, etc Optional partition thickness: 65mm, 85mm, 100mm Partition material: high hardness aluminum alloy, high quality steel, PAR sound-absorbing glass fiber, environmental protection wood decoration panel, etc Color: any color, soft package or hard package Function: beautiful, sound insulation, flexible use of space, simple operation and so on.In a nutshell: any place that needs an interior structural layout can be used.
FAQ
1:What you should you do on site?
A beam (truss)should built on site for track installation.The minimum distance leaving for track installation from false ceiling to top ceiling is 180mm.
2:How to install?
We will provide the installation manual and video guiding the installation job.We can also dispatch the installation engineer supervising the installation as request.
3:What is lead time ?
The lead time is 7 days to 10days.
4:How to transport?
Sea transport is a common mode of transportation.In an emergency,can be air freight .
5:How do the goods packing?
Carton paper package ,MDF batten cover all around cotner.
6:What is procurement procedure?
Firstly, seng us the shop drawing (if the shop drawings is not available ,you can tell us the height from false ceiling to finfshed floor and width from wall to wall)
Secondly, we offer you the movable wall layout drawings for your confirmation.
Thirdly, we quote the movable wall in acordance with confirmed drawings.
Modernized Soundproof Movable partition | |
1.Hanging on ceiling | The floor without a track, just put the rail mounted on the ceiling |
2.Excellent Quality | Each pieces of partition can turn around 360 degree. |
3.Stable and secure | After partition is stable and reliable, and is not easy to swing |
4.Energy efficient | The large space divided into a small space, in order to reduce air conditioning power consumption; |
5.Heatproof&fireproof | Good heat insulation performance, Adopt effective fire prevention materials |
6.Elegant appearance | Surface any adornment, can unite with indoor adornment effect |
7.Easy to collect | Can be hidden in the special coffer, does not affect the overall appearance |
8.Various applications | Hotels, exhibition halls, restaurants, multi-functional rooms etc. |